{"id":864,"date":"2021-04-13T07:46:54","date_gmt":"2021-04-13T07:46:54","guid":{"rendered":"https:\/\/trivietme.vn\/?p=864"},"modified":"2021-05-14T07:56:51","modified_gmt":"2021-05-14T07:56:51","slug":"request-a-solar-power-project-review","status":"publish","type":"post","link":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/","title":{"rendered":"Request a Solar Power Project Review"},"content":{"rendered":"<p>The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation.<\/p>\n<p>EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have been put into operation, and apply the FIT price in Decision 13. receive back these power systems to ensure the regulations on development, connection, date recognition, power purchase agreement and other regulations and send them to the local Department of Industry and Trade before March 11.<\/p>\n<p>The ministry also requested EVN to propose solutions to limit the reduction of solar power sources that have been put into operation. The Group is also required to send a representative to join the inspection team of the Ministry of Industry and Trade in this regard. Information will be sent back by March 12.<\/p>\n<figure id=\"attachment_1105\" aria-describedby=\"caption-attachment-1105\" style=\"width: 598px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1105 \" src=\"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628-300x189.jpg\" alt=\"Dau Tieng solar power project (Tay Ninh) in May 2019\" width=\"598\" height=\"377\" srcset=\"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628-300x189.jpg 300w, https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628-1024x645.jpg 1024w, https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628-768x484.jpg 768w, https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg 1200w\" sizes=\"auto, (max-width: 598px) 100vw, 598px\" \/><figcaption id=\"caption-attachment-1105\" class=\"wp-caption-text\">Dau Tieng solar power project (Tay Ninh) in May 2019<\/figcaption><\/figure>\n<p>The localities also have to coordinate with relevant departments and branches to review and evaluate rooftop solar power projects. On March 5, the Ministry of Industry and Trade established an inspection team for solar power development.<\/p>\n<p>In February, Prime Minister Nguyen Xuan Phuc asked to control the development of solar power, not to overload the grid and cause negative consequences in the future. He emphasized: &#8220;Do not let solar power develop massively according to the movement&#8221;. The Ministry of Industry and Trade is assigned the main responsibility, in coordination with relevant parties, to review the overall review of solar-powered terrestrial and rooftop solar power projects.<\/p>\n<p>At the end of last year, EVN&#8217;s data showed that the total power capacity in the national power system excluding rooftop solar power reached over 62,000 MW, of which solar power on the ground reached 8,838 MW; Rooftop solar power is involved in supplying about 8,000 MW.<\/p>\n<p>The development of uncontrolled rooftop solar power sources is in line with demand, making it difficult to operate the national power system. The demand for electricity last year was also affected by the influence of Covid-19.<\/p>\n<p>Therefore, from the beginning of 2021, EVN had to develop and implement a plan to cut solar power, as well as other renewable energy sources in the national power system, which could cause a waste of social resources. and anxiety and frustration of many investors.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation. EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have<\/p>\n","protected":false},"author":1,"featured_media":1105,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,21],"tags":[],"class_list":["post-864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","category-tin-chuyen-nganh-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Request a Solar Power Project Review - C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t<\/title>\n<meta name=\"description\" content=\"The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation.EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have been put into operation, and apply the FIT price in Decision 13. receive back these power systems to ensure the regulations on development, connection, date recognition, power purchase agreement and other regulations and send them to the local Department of Industry and Trade before March 11.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Request a Solar Power Project Review - C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t\" \/>\n<meta property=\"og:description\" content=\"The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation.EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have been put into operation, and apply the FIT price in Decision 13. receive back these power systems to ensure the regulations on development, connection, date recognition, power purchase agreement and other regulations and send them to the local Department of Industry and Trade before March 11.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/\" \/>\n<meta property=\"og:site_name\" content=\"C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-13T07:46:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-14T07:56:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"756\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"vina_admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vina_admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/\"},\"author\":{\"name\":\"vina_admin\",\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/#\\\/schema\\\/person\\\/5d31a707cb3dc12983b2d7b3a884c0bc\"},\"headline\":\"Request a Solar Power Project Review\",\"datePublished\":\"2021-04-13T07:46:54+00:00\",\"dateModified\":\"2021-05-14T07:56:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/\"},\"wordCount\":401,\"image\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/trivietme.vn\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg\",\"articleSection\":[\"News\",\"Specialized news\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/\",\"url\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/\",\"name\":\"Request a Solar Power Project Review - C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/trivietme.vn\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg\",\"datePublished\":\"2021-04-13T07:46:54+00:00\",\"dateModified\":\"2021-05-14T07:56:51+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/#\\\/schema\\\/person\\\/5d31a707cb3dc12983b2d7b3a884c0bc\"},\"description\":\"The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation.EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have been put into operation, and apply the FIT price in Decision 13. receive back these power systems to ensure the regulations on development, connection, date recognition, power purchase agreement and other regulations and send them to the local Department of Industry and Trade before March 11.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/#primaryimage\",\"url\":\"https:\\\/\\\/trivietme.vn\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg\",\"contentUrl\":\"https:\\\/\\\/trivietme.vn\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg\",\"width\":1200,\"height\":756,\"caption\":\"DCIM103MEDIADJI_0130.JPG\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/request-a-solar-power-project-review\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Request a Solar Power Project Review\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/\",\"name\":\"C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t\",\"description\":\"M\u1ed9t trang web m\u1edbi s\u1eed d\u1ee5ng WordPress\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/#\\\/schema\\\/person\\\/5d31a707cb3dc12983b2d7b3a884c0bc\",\"name\":\"vina_admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64c9ff52af09d2e900b9525e1b540b2e76f0e31569be0a30bf0ee0ea70fe2539?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64c9ff52af09d2e900b9525e1b540b2e76f0e31569be0a30bf0ee0ea70fe2539?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/64c9ff52af09d2e900b9525e1b540b2e76f0e31569be0a30bf0ee0ea70fe2539?s=96&d=mm&r=g\",\"caption\":\"vina_admin\"},\"sameAs\":[\"http:\\\/\\\/30606.nhandh.vinawebsite.vn\"],\"url\":\"https:\\\/\\\/trivietme.vn\\\/en\\\/author\\\/vina_admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Request a Solar Power Project Review - C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t","description":"The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation.EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have been put into operation, and apply the FIT price in Decision 13. receive back these power systems to ensure the regulations on development, connection, date recognition, power purchase agreement and other regulations and send them to the local Department of Industry and Trade before March 11.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/","og_locale":"en_US","og_type":"article","og_title":"Request a Solar Power Project Review - C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t","og_description":"The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation.EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have been put into operation, and apply the FIT price in Decision 13. receive back these power systems to ensure the regulations on development, connection, date recognition, power purchase agreement and other regulations and send them to the local Department of Industry and Trade before March 11.","og_url":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/","og_site_name":"C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t","article_published_time":"2021-04-13T07:46:54+00:00","article_modified_time":"2021-05-14T07:56:51+00:00","og_image":[{"width":1200,"height":756,"url":"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg","type":"image\/jpeg"}],"author":"vina_admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vina_admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/#article","isPartOf":{"@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/"},"author":{"name":"vina_admin","@id":"https:\/\/trivietme.vn\/en\/#\/schema\/person\/5d31a707cb3dc12983b2d7b3a884c0bc"},"headline":"Request a Solar Power Project Review","datePublished":"2021-04-13T07:46:54+00:00","dateModified":"2021-05-14T07:56:51+00:00","mainEntityOfPage":{"@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/"},"wordCount":401,"image":{"@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/#primaryimage"},"thumbnailUrl":"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg","articleSection":["News","Specialized news"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/","url":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/","name":"Request a Solar Power Project Review - C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t","isPartOf":{"@id":"https:\/\/trivietme.vn\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/#primaryimage"},"image":{"@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/#primaryimage"},"thumbnailUrl":"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg","datePublished":"2021-04-13T07:46:54+00:00","dateModified":"2021-05-14T07:56:51+00:00","author":{"@id":"https:\/\/trivietme.vn\/en\/#\/schema\/person\/5d31a707cb3dc12983b2d7b3a884c0bc"},"description":"The Ministry of Industry and Trade requested localities and EVN to review the solar power project, proposing effective solutions to limit the reduction of power sources already in operation.EVN is assigned to direct its sub-units to make a list with rooftop solar power systems with a capacity of 100 kWp or more that have been put into operation, and apply the FIT price in Decision 13. receive back these power systems to ensure the regulations on development, connection, date recognition, power purchase agreement and other regulations and send them to the local Department of Industry and Trade before March 11.","breadcrumb":{"@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/#primaryimage","url":"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg","contentUrl":"https:\/\/trivietme.vn\/wp-content\/uploads\/2021\/03\/dien-mat-troi-tay-ninh-5-16153-3305-3255-1615369628.jpg","width":1200,"height":756,"caption":"DCIM103MEDIADJI_0130.JPG"},{"@type":"BreadcrumbList","@id":"https:\/\/trivietme.vn\/en\/request-a-solar-power-project-review\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/trivietme.vn\/en\/"},{"@type":"ListItem","position":2,"name":"Request a Solar Power Project Review"}]},{"@type":"WebSite","@id":"https:\/\/trivietme.vn\/en\/#website","url":"https:\/\/trivietme.vn\/en\/","name":"C\u00f4ng Ty TNHH Th\u01b0\u01a1ng M\u1ea1i C\u01a1 \u0110i\u1ec7n Tr\u00ed Vi\u1ec7t","description":"M\u1ed9t trang web m\u1edbi s\u1eed d\u1ee5ng WordPress","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/trivietme.vn\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/trivietme.vn\/en\/#\/schema\/person\/5d31a707cb3dc12983b2d7b3a884c0bc","name":"vina_admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/64c9ff52af09d2e900b9525e1b540b2e76f0e31569be0a30bf0ee0ea70fe2539?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/64c9ff52af09d2e900b9525e1b540b2e76f0e31569be0a30bf0ee0ea70fe2539?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/64c9ff52af09d2e900b9525e1b540b2e76f0e31569be0a30bf0ee0ea70fe2539?s=96&d=mm&r=g","caption":"vina_admin"},"sameAs":["http:\/\/30606.nhandh.vinawebsite.vn"],"url":"https:\/\/trivietme.vn\/en\/author\/vina_admin\/"}]}},"_links":{"self":[{"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/posts\/864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/comments?post=864"}],"version-history":[{"count":5,"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/posts\/864\/revisions"}],"predecessor-version":[{"id":1596,"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/posts\/864\/revisions\/1596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/media\/1105"}],"wp:attachment":[{"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/media?parent=864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/categories?post=864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/trivietme.vn\/en\/wp-json\/wp\/v2\/tags?post=864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}